EMECO

  • Trustfeed ratings Icon
  • Trustfeed ratings Icon
  • Trustfeed ratings Icon
  • Trustfeed ratings Icon
  • Trustfeed ratings Icon

Amman, Jordan

emecojo.com
Oil & Energy

EMECO Reviews | Rating 3 out of 5 stars (5 reviews)

EMECO is rated 3 out of 5 in the category oil & energy. Read and write reviews about EMECO. EMECO was established in 2004 and is a joint Venture between NEPCO (National Electric Power Company - Jordan) and Mitsa International (Cyprus). Mitsa International has over thirty years of experience in contract supply and energized maintenance services for MV and EHV Networks. Their manufacturing partners are specialized in producing and material for electrical networks. NEPCO is the bulk transmission operator in Jordan. The NEPCO network is composed of 400 kV and 132 kV circuits. The transmission system is structured on the north-south axis of Jordan. It is essentially a radial system with no looping except for a small ring around the main load center of Amman. The distribution systems are served from this system at 132 kV. The direct service bulk customers are also served from this system. There are about 2200 circuit-km of transmission lines currently operated at 132 kV, which represents about 73% of the total networks. In addition, there are 809 circuit-km of transmission lines operated at 400 kV . NEPCO also operates the main substations to provide services to the various distribution networks.

Address

7th Circle, Swefiah

Company size

11-50 employees

Headquarters

Amman

Founded

2004

Open hours

...
There is no reviews yet about EMECO, be the first to write a review and give your rating to EMECO
Write review Claim Profile